Continuing our previous posts, where we looked at Campaign planning, segmentation, deliveries. In this post, we’d look at Flow Control tab and various steps in it, for running the campaign. We can use the Start step inside the Flow Control tab, to specify the starting point within the workflow. We can use the End step … Continue reading “Notes on Adobe Campaign v6 – Running…
Continue Reading Nishant Rana’s Article on their blog
Notes on Adobe Campaign v6 – Running a campaign
Continuing our previous posts, where we looked at Campaign planning, segmentation, deliveries. In this post, we’d look at Flow Control tab and various steps in it, for running the campaign. We can use the Start step inside the Flow Control tab, to specify the starting point within the workflow.
Blog Syndicated with Nishant Rana’s Permission
More About This Author
Array
- Dyn365CE23 April 2024Portal does not load and displays “Server Error” or shows “Getting set up.. This might take a while” message -Portal Startup Issue (PowerApps Portal)
- Dyn365CE22 April 2024Versioning and Drafts for Solution-based Cloud Flows – Power Automate
- Dyn365CE16 April 2024What will happen on changing the password of the user account used as the Owner of Cloud Flow and for Connection – Power Automate
- Dyn365CE15 April 2024Using Focused view in Dynamics 365