Continuing our previous posts, where we looked at Campaign planning, segmentation, deliveries. In this post, we’d look at Flow Control tab and various steps in it, for running the campaign. We can use the Start step inside the Flow Control tab, to specify the starting point within the workflow. We can use the End step … Continue reading “Notes on Adobe Campaign v6 – Running…
Continue Reading Nishant Rana’s Article on their blog
Notes on Adobe Campaign v6 – Running a campaign
Continuing our previous posts, where we looked at Campaign planning, segmentation, deliveries. In this post, we’d look at Flow Control tab and various steps in it, for running the campaign. We can use the Start step inside the Flow Control tab, to specify the starting point within the workflow.
Blog Syndicated with Nishant Rana’s Permission
More About This Author
Array
- Dyn365CE30 April 2024Use Geolocation Settings for Location Tracking and Auditing – Dynamics 365 Field Service
- Dyn365CE29 April 2024Fix the trigger – Microsoft.OData.ODataException: A binary operator with incompatible types was detected. Found operand types ‘Edm.Guid’ and ‘Edm.String’ for operator kind ‘Equal’ (Power Automate / Dataverse)
- Dyn365CE23 April 2024Portal does not load and displays “Server Error” or shows “Getting set up.. This might take a while” message -Portal Startup Issue (PowerApps Portal)
- Dyn365CE22 April 2024Versioning and Drafts for Solution-based Cloud Flows – Power Automate